OBJECTIVE: PROJECT PLANNER / SCHEDULER Highlights
of Qualifications: ·
Several years of experience in
Project Controls as, lead and Senior planner/Scheduler & Cost
Control/Analyst within EPCM environment focusing on Energy (Oil & Gas),
Utilities, Natural Gas Pipeline, Infrastructure, Construction oil & gas
and petrochemical projects. ·
Advanced skills in Primavera P6,
P3, MS Project, MS Office and Experienced in implementation of project
control tools and techniques. ·
Developed and maintained overall
and detail project schedules. Set up of Work Breakdown Structure in
accordance with Project Execution Strategies. ·
Provided variance analyses of
critical plans with the required/ appropriate counter measures in order not to
jeopardize the project schedule, audits on contractor’s schedule performance
and processes. ·
Periodic audits on contractor’s
schedule performance and processes. ·
Participate/active involvement in
the identification of project schedule risk assessment, analysis and
mitigation proposals. ·
Major milestones and detailed
activities of construction and commissioning identifying and sequencing;
discipline-wise, area-wise and system-wise ·
Coordination of reporting
interfaces with contractors and other departments. ·
Maintained and developed project
controls procedures and progress measurement etc… ·
Responsible for weekly/monthly
progress reports. Professional Experience: Senior
Planner- Area Planner – Shell Canada2014-2015 Carmon
Creek Project. Field
Facilities and Infrastructure Planning which is include D&G and Utility
pipelines, UV & LV Power transmit ion & Fiber Optic, Well Drilling
and Well pads preparation. •
Reviewed main Engineering Drawing (Key Plan, P&IDs, PFDs, Single line
diagrams, etc.) for Utility Pipelines, Fiber Optic Cables, Well pads
Modularization and their fabrication and construction sequences. •
Developed and implemented EPCM baseline schedules. •
Finalized Resource loading, forecast Man-Power allocation and project cost. •
Prepared Project Progress, Cost, KPI and Variance reports. •
incorporated project management procedures and reporting requirements. •
Analyzes Key
project milestones, detailed and summery schedules of Engineering, Material
Delivery, construction, Module Fabrication and commissioning to identify
potential schedule impacts. Senior
Planner - Imperial Oil (Calgary, Alberta)2012-2014 Kearl
Expansion Oil Sands Project, Phase two (KEP). Increased overall production to
345,000 barrels per day. Kearl Expansion contains different areas as of Froth
& Flare, Utilities, Extraction, Tailings, Hydrotarnsport Pipelines and
Infrastructure. •
Developed and implemented of project controls procedures and Project
Execution Plan. •
Reviewed main Engineering Drawing (P&IDs, PFDs, Single line diagrams,
etc.) and marked up commissionable systems and sub-systems. •
Developed and implemented EPC baseline schedules •
Finalized Resource loading, forecast man-power allocation. •
Prepared reporting status of A, B & C commissioning check sheets and
progress calculation. •
incorporated project management procedures and reporting requirements are. •
Key project milestones, detailed and summery schedules of construction and
commissioning identified and sequenced discipline-wise, area-wise and
system-wise. •
Prepared TCP (Technical Commissioning Procedures) Plan and calculated Earn
Value progress and allocated resource to generate TCPs. Senior
Planner - Amec America Co. – (Calgary, Alberta) 2007-2012 •
Kearl Oil Sands Project Phase one (KID). It will produce approximately
110,000-barrels per day. Kearl Initial contains different area as of Froth
& Flare, Utilities, Extraction, Tailings, Hydrotarnsport Pipelines and
Infrastructure. Approximated cost was 12.9$ Billion. • Seconded
on Imperial Oil Since 2008 to 2012 Prepared and update schedules
in Infrastructure, Regulatory & permits on feed phase and Commissioning
& start-up, Operating and maintenance Planner on EPCM phases (KID &
KEP) of Kearl Lake project. • Prepared work breakdown structure
(WBS) • Responsible for preparation of
level I to Level III Engineering and EPC schedule. • Development and implementation of
Schedule Bases Memorandum (SBM) • Review Engineering drawings to
Validate of Engineering assumption and. • Reporting project duration,
critical Path analysis and Resource allocation and leveling base on project
deliverables to meet equipment fabrication and construction requirements. • Reporting status of A, B & C
commissioning check sheets and progress calculation. •
Developed Level 3 schedule for EPC Phase PLANNER / SCHEDULER SNC-Lavalin
Co. (Calgary, Alberta)2006-2007 Responsible
for the overall planning, detail project schedules in several levels and set
up of Work Breakdown Structure in accordance with duties in the Froth
treatment Phases 2&3 and NWA. Senior PLANNER / SCHEDULER Namvaran Consultants Engineering Co.
(Tehran, Iran)2000-2006 Responsible
for the planning overall and detail project schedules. Scheduling and Set up
of Work Breakdown Structure in accordance with duties in the Pazanan gas
injection project, Kermanshah Urea & Ammonia petrochemical complex,
Emam port Natural gas fraction (EPC) projects and Urmia 30”
Natural Gas Pipeline project (240KM). Provide a
key role in integrating various project schedules identifying timely schedule
trends that may affect the overall project objective. PLANNER / SCHEDULER SAB
CONSTRUCTION Co. Tehran, Iran1995-2000 Responsible
for the planning overall and detail project schedules scheduling and Set up
of Work Breakdown Structure in accordance with hydro power plant of Karkheh
reservoir dam project. This is the biggest dam in Middle East and this was
the first time that an Iranian company did such a project. EDUCATION: BSc.
Industrial Engineering, Azad University (Esfahan–Iran) 1995. Association
Membership: ·
APEGA applicant. References: ·