From:                              route@monster.com

Sent:                               Friday, August 19, 2016 10:53 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Mehrdad Mani 

Last updated:  07/11/16

Job Title:  no specified

Company:  Apeiron, Inc.

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Calgary, AB  T3H5T8
CA

Mobile: 403-973-4586   
Home:
403-454-4586
mehrdadmani@yahoo.com
https://www.linkedin.com/in/mehrdad-mani-83438721?
Contact Preference:  Mobile Phone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Mehrdad Mani - Planner & Scheduler

Resume Value: fd7dcwtptpe82h69   

  

 

MEHRDAD MANI

390 Discovery Ridge Blvd. SW.

Calgary, AB, T3H 5T8

Phone: +1-403-454-4586

Cell: +1-403-973-4586

Email: mehrdadmani@yahoo.com

 

CAREER OBJECTIVE: PROJECT PLANNER / SCHEDULER

 

Highlights of Qualifications:

·           Several years of experience in Project Controls as, lead and Senior planner/Scheduler & Cost Control/Analyst within EPCM environment focusing on Energy (Oil & Gas), Utilities, Natural Gas Pipeline, Infrastructure, Construction oil & gas and petrochemical projects.

·           Advanced skills in Primavera P6, P3, MS Project, MS Office and Experienced in implementation of project control tools and techniques.

·           Developed and maintained overall and detail project schedules. Set up of Work Breakdown Structure in accordance with Project Execution Strategies.

·           Provided variance analyses of critical plans with the required/ appropriate counter measures in order not to jeopardize the project schedule, audits on contractor’s schedule performance and processes.

·           Periodic audits on contractor’s schedule performance and processes.

·           Participate/active involvement in the identification of project schedule risk assessment, analysis and mitigation proposals.

·           Major milestones and detailed activities of construction and commissioning identifying and sequencing; discipline-wise, area-wise and system-wise

·           Coordination of reporting interfaces with contractors and other departments.

·           Maintained and developed project controls procedures and progress measurement etc…

·           Responsible for weekly/monthly progress reports.

Professional Experience:

 

Senior Planner- Area Planner – Shell Canada2014-2015

Carmon Creek Project.

Field Facilities and Infrastructure Planning which is include D&G and Utility pipelines, UV & LV Power transmit ion & Fiber Optic, Well Drilling and Well pads preparation.

• Reviewed main Engineering Drawing (Key Plan, P&IDs, PFDs, Single line diagrams, etc.) for Utility Pipelines, Fiber Optic Cables, Well pads Modularization and their fabrication and construction sequences.

• Developed and implemented EPCM baseline schedules.

• Finalized Resource loading, forecast Man-Power allocation and project cost.

• Prepared Project Progress, Cost, KPI and Variance reports.

• incorporated project management procedures and reporting requirements.

• Analyzes Key project milestones, detailed and summery schedules of Engineering, Material Delivery, construction, Module Fabrication and commissioning to identify potential schedule impacts.

 

Senior Planner - Imperial Oil (Calgary, Alberta)2012-2014

Kearl Expansion Oil Sands Project, Phase two (KEP).

 Increased overall production to 345,000 barrels per day. Kearl Expansion contains different areas as of Froth & Flare, Utilities, Extraction, Tailings, Hydrotarnsport Pipelines and Infrastructure.

• Developed and implemented of project controls procedures and Project Execution Plan.

• Reviewed main Engineering Drawing (P&IDs, PFDs, Single line diagrams, etc.) and marked up commissionable systems and sub-systems.

• Developed and implemented EPC baseline schedules

• Finalized Resource loading, forecast man-power allocation.

• Prepared reporting status of A, B & C commissioning check sheets and progress calculation.

• incorporated project management procedures and reporting requirements are.

• Key project milestones, detailed and summery schedules of construction and commissioning identified and sequenced discipline-wise, area-wise and system-wise.

• Prepared TCP (Technical Commissioning Procedures) Plan and calculated Earn Value progress and allocated resource to generate TCPs.

Senior Planner - Amec America Co. – (Calgary, Alberta) 2007-2012

Kearl Oil Sands Project Phase one (KID). It will produce approximately 110,000-barrels per day. Kearl Initial contains different area as of Froth & Flare, Utilities, Extraction, Tailings, Hydrotarnsport Pipelines and Infrastructure. Approximated cost was 12.9$ Billion.

Seconded on Imperial Oil Since 2008 to 2012

 Prepared and update schedules in Infrastructure, Regulatory & permits on feed phase and Commissioning & start-up, Operating and maintenance Planner on EPCM phases (KID & KEP) of Kearl Lake project.

• Prepared work breakdown structure (WBS)

• Responsible for preparation of level I to Level III Engineering and EPC schedule.

• Development and implementation of Schedule Bases Memorandum (SBM)

• Review Engineering drawings to Validate of Engineering assumption and.

• Reporting project duration, critical Path analysis and Resource allocation and leveling base on project deliverables to meet equipment fabrication and construction requirements.

• Reporting status of A, B & C commissioning check sheets and progress calculation.

• Developed Level 3 schedule for EPC Phase
• Resource loaded the detailed schedules 
• Critical Path Analysis and what-if scenarios

 

PLANNER / SCHEDULER

SNC-Lavalin Co. (Calgary, Alberta)2006-2007

Responsible for the overall planning, detail project schedules in several levels and set up of Work Breakdown Structure in accordance with duties in the Froth treatment Phases 2&3 and NWA.

 

Senior PLANNER / SCHEDULER

Namvaran Consultants Engineering Co. (Tehran, Iran)2000-2006

Responsible for the planning overall and detail project schedules. Scheduling and Set up of Work Breakdown Structure in accordance with duties in the Pazanan gas injection project, Kermanshah Urea & Ammonia petrochemical complex,  Emam port Natural gas fraction (EPC) projects and Urmia 30” Natural Gas Pipeline project (240KM).

Provide a key role in integrating various project schedules identifying timely schedule trends that may affect the overall project objective.

 

PLANNER / SCHEDULER

SAB CONSTRUCTION Co. Tehran, Iran1995-2000

Responsible for the planning overall and detail project schedules scheduling and Set up of Work Breakdown Structure in accordance with hydro power plant of Karkheh reservoir dam project. This is the biggest dam in Middle East and this was the first time that an Iranian company did such a project.

 

EDUCATION:

BSc. Industrial Engineering, Azad University (Esfahan–Iran) 1995.

 

Association Membership:

·            APEGA applicant.

 

References:

·            Available upon request.



Experience

BACK TO TOP

 

Job Title

Company

Experience

Lead Planner & Scheduler

Shell Canada Energy

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

10+ to 15 Years

Work Status:

Canada - I am authorized to work in this country for any employer.

 

 

Target Job:

Target Job Title:

Planner & Scheduler

 

Target Company:

Company Size:

Occupation:

Engineering

·         General/Other: Engineering

 

Target Locations:

Selected Locations:

Canada-AB-Calgary
US

Relocate:

No